AGD commission and hand over 5mtr sliding steel tracked gate system with full safety egde protection and vehicle detector induction loops.

The project also included over 130m of new vertical rail perimeter fencing, 3 pairs of manual gates and 35m of renovated railings.
In addition, over 30m of coach park perimeter fencing and 1 pair of 6m x 2m manual gates were installed.
The project was undertaken on behalf of Gleeson Buildings.
